FYI: The "Day #" in the title is the number of days I am without a kitchen. This will include weekends and days where the contractor nor any sub-contractors show up to work.
We're ready for the HVAC work. The white arrow points to the repair in the ceiling and the green arrow points to the new location for the exhaust to our new hood. This is a slight relocation of existing duct work that goes through our attic and out our roof.
This is the space where our dining table sits. Today they removed the molding along the floor. I think this will be a great wall to place some new artwork.
This photo looks no different from the last one I posted. But if you look closely, you'll see that they added about 1/4" to the edge of the studs. They did that on the opposite wall as well. I assume it has something to do with the drywall and plaster they will install after the plumbing and electrical work is completed and approved. This is one of those details that I don't need to understand. I just trust the professionals to do what is needed.