Skip to main content

All done!

 We officially finished on April 10th for a total of 95 days from project start to finish. We've been adjusting to the new layout and now have almost two-months of working in our new kitchen. I absolutely love it!  We achieved all of our goals with an updated cooktop, updated oven, more counter and storage space, and so much lighting. I was much more invested in the functioning of the new space rather than the aesthetics. However, when I saw how lovely everything turned out, I was briefly motivated to prioritize the neat clean look by keeping the counters clear and the fridge door free of clutter. Eventually I came to my senses and remembered that my kitchen is meant to be used and not only admired.

Enjoy these final photos and be sure to look back to Day 0 for the before pictures.











Some organizational hacks, some planned ahead of time, some not.








Comments

  1. It looks so good AND so functional. Those bench cushions are a nice touch.

    ReplyDelete
  2. Looks wonderful! Yay!

    ReplyDelete

Post a Comment

Popular posts from this blog

Day 61 Backsplash!

 We're getting so close.  I love the tiles and the random pattern created by the installer.

Day 43 So Many Cabinets!

 We have so many lovely cabinets.  I'm looking forward to organizing all my kitchen stuff into these spaces.   All of the lower cabinets are drawers. Drawers are more accessible than cabinets with shelves.   (The one mis-matched cupboard and the darker floor-to-ceiling panel will be replaced to match the lighter color.) Evidence of a temporary mistake. The cabinet installers neglected to install a 1/2" spacer to allow the drawers to clear the existing molding. Much better.  I'm sure it was a lot of effort to move the whole wall of cabinets 1/2" to the right. The "mud room" area is coming along nicely.

Day 54 We Have Counters and a Sink!

Counters and our new sink were installed this morning.   Hi-Macs Solid Surface in Color Portland